Contents
2 SUMMARY OF EM&A REQUIREMENTS AND MONITORING RESULTS
6 NON-COMPLIANCE, COMPLAINTS, NOTIFICATIONS OF SUMMONS AND
SUCCESSFUL PROSECUTIONS
7 IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURE
8 CONCLUSION AND RECOMMENDATION
Tables
Table 1 Contact Information of Key
Personnel
Table 2 Main Construction Works carried out
in the Reporting Period
Table 3 Air Quality and Noise Monitoring
Locations
Table 4 Coordinates of Water Quality
Monitoring Locations
Table 5 Summary of Water Quality Exceedance
Table 6 Observations and Recommendations of
Site Audit
Table 7 Waste Generated by the Construction
and Disposal Ground
Table 8 Status of submissions required
under the EP
Figures
Figure
1 Location of Proposed Yuen Long
Effluent Polishing Plant
Figure
2 Location of Construction Dust Monitoring Stations
Figure
3 Noise Monitoring Locations
Figure
4 Water Quality Monitoring Locations
Figure
5 Ecology Monitoring Locations
Appendix
Appendix A Construction Programme
Appendix B Project Organization Chart
Appendix C Action and Limit Levels
Appendix D Graphical Presentation of Monitoring Data
Appendix E EVENT AND ACTION PLANS
Appendix G Implementation Status of Environmental
Mitigation Measures