EXECUTIVE SUMMARY

1          INTRODUCTION

2          SUMMARY OF EM&A REQUIREMENTS AND MONITORING RESULTS

3          LANDSCAPE AND VISUAL

4          LAND CONTAMINATION

5          SITE INSPECTION AND AUDIT

6          NON-COMPLIANCE, COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS

7          IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURE

8          CONCLUSION AND RECOMMENDATION

 

Tables

Table 1             Contact Information of Key Personnel

Table 2             Main Construction Works carried out in the Reporting Period

Table 3             Air Quality and Noise Monitoring Locations

Table 4             Coordinates of Water Quality Monitoring Locations

Table 5             Summary of Water Quality Exceedance

Table 6             Observations and Recommendations of Site Audit

Table 7             Waste Generated by the Construction and Disposal Ground

Table 8             Status of submissions required under the EP

 

Figures

Figure 1            Location of Proposed Yuen Long Effluent Polishing Plant

Figure 2            Location of Construction Dust Monitoring Stations.

Figure 3            Noise Monitoring Locations.

Figure 4            Water Quality Monitoring Locations.

Figure 5            Ecology Monitoring Locations.

Appendix

Appendix A     Construction Programme

Appendix B     Project Organization Chart

Appendix C     Action and Limit Levels

Appendix D     Graphical Presentation of Monitoring Data

Appendix E     EVENT AND ACTION PLANS

Appendix F     WASTE FLOW TABLE

Appendix G     Implementation Status of Environmental Mitigation Measures

Appendix H     Cumulative statistics on Environmental Complaints, Notifications of Summons and Successful Prosecutions